How is the installation tested to ensure it meets the FAA Requirements?

Once the tailBeacon has been installed it is required that the equipment be tested to show it meets the FAA requirements for ADS-B OUT. An Operational Flight Evaluation (often referred to as a performance flight) must be performed and verified by the FAA.  Additionally, the installer may verify performance on the ground using an ADS-B ramp test [...]